Analyze client requirements, target audience, and market trends.
Develop concepts, sketch ideas, design layouts, and refine prototypes.
Gather client feedback and refine the design accordingly.
Finalize design files, produce, and support implementation.
Answers to questions you might have about Torch.
You can contact us via email at dexcostudio@gmail.com.
🎨 Graphic & Branding Design:
- Logo Design: 1–2 weeksLogo design typically involves presenting a few initial concepts and making revisions based on client feedback. Simple logos can be done quickly, but more complex and creative logos may take longer.
- Branding Design (Logo + Colors, Fonts, Style Guide): 2–4 weeksBranding design includes not just the logo but also the color palette, typography, and other elements of brand identity. Since multiple drafts and feedback rounds are involved, this process can take longer.
- Branding Kit: 3–6 weeksA branding kit includes the logo, colors, fonts, and additional design work such as business cards, social media templates, letterheads, and advertising banners. More work is involved, so it takes longer to complete.
- Other Graphic Design Work (Posters, Flyers, Web Banners, etc.): 1–2 weeksSimple graphic design tasks can generally be completed in a shorter timeframe. The complexity of the work may affect the time needed.
💻 Web Design & Digital Design:Simple Website (1–5 pages): 1–3 weeksWebsites like personal blogs or simple landing pages are relatively quick to design and develop.
Medium-Sized Website (5–20 pages): 3–6 weeksCorporate websites or portfolio sites that require more design work, content organization, and user experience (UX) considerations take more time.Large Website (20+ pages): 6 weeks or moreLarge websites, such as e-commerce platforms or portal sites, are more complex and include intricate functionality, design work, and user testing, so they require more time.
🏢 Exhibition Design:Small Exhibition (Small Booth Design): 2–4 weeksSmaller exhibitions require simpler designs with fewer materials and installations. Usually, 1–2 designers work on these projects, and revisions can be made quickly, allowing for a faster turnaround.
Medium-Sized Exhibition (Medium Booth or Small Exhibition Hall): 4–6 weeksMedium-sized exhibitions require more design elements and materials. Considering installation, lighting, and display factors, the project may take longer.
Large Exhibition (Exhibition Hall, Large Booths, etc.): 6–8 weeks or moreLarge-scale exhibitions require more detailed planning and design, considering space layout, display systems, graphics, lighting, and AV equipment. Multiple rounds of feedback and revisions might extend the timeline.
Installation & Setup: 1–3 daysAfter the design is completed, exhibition installation is necessary. The setup time depends on the size and complexity of the exhibition. Smaller exhibitions can be installed in a day, while larger ones may take several days.
🎨 Graphic & Branding Design
Logo Design: from $500 – $5,000
Branding Design: from $1,500 (including logo, color palette, typography, style guide)
Business Card Design: from $100
Flyer / Poster Design: from $150
Brochure Design: from $500
Social Media Graphics: from $50
Web Banner / Ad Design: from $100
Presentation Design (PowerPoint, Keynote, etc.): from $200
Packaging Design: from $1,000 – $10,000
Illustrations / Custom Graphics: from $200
💻 Website Design
Simple Website (1–5 pages): from $1,000 – $5,000
Medium-Sized Website (10–20 pages): from $10,000
Complex Websites (e-commerce, large platforms): from $30,000
🏢 Exhibition Design
Small Booth: from $2,000
Medium-Sized Booth: from $5,000
Large Exhibition Hall: from $15,000
Installation & Setup Costs: Vary depending on the size and complexity of the exhibition
Project-Based Payments: Payments are made based on the project's progress, with predefined milestones (e.g., after the first design draft, after the second revision, etc.).
Example:
First Milestone: 30% at the start of the contract
Second Milestone: 40% after submitting the design draft
Third Milestone: 30% upon final completion of the project